In plain words
Here is what the day looks like. The technician arrives, watches how the door behaves, then unplugs the old unit and tests the door by hand. Once balance is confirmed, the old head, rail, sensors and control come down and the new rail is assembled on the floor. The header bracket goes into solid framing above the door, the head is hung level from the joists, the door arm and reinforcement are fitted, and the sensors and wall console are wired. Travel, force and safety tests follow, then programming of remotes and keypad. Allow a morning or an afternoon, and a little longer if door work is added.